Conta Contactos
O seu carrinho
Envio por DPD e FedEx
Precisa de ajuda? Pergunte à IA

Conjunto de quadro branco Vogel's RISE WBS75 75 polegadas para RISE 2xxx e RISE 4xxx

Conjunto de quadro branco Vogel's RISE WBS75 75 polegadas para RISE 2xxx e RISE 4xxx
Conjunto de quadro branco Vogel's RISE WBS75 75 polegadas para RISE 2xxx e RISE 4xxx
Conjunto de quadro branco Vogel's RISE WBS75 75 polegadas para RISE 2xxx e RISE 4xxx
Conjunto de quadro branco Vogel's RISE WBS75 75 polegadas para RISE 2xxx e RISE 4xxx
Conjunto de quadro branco Vogel's RISE WBS75 75 polegadas para RISE 2xxx e RISE 4xxx
Conjunto de quadro branco Vogel's RISE WBS75 75 polegadas para RISE 2xxx e RISE 4xxx
Conjunto de quadro branco Vogel's RISE WBS75 75 polegadas para RISE 2xxx e RISE 4xxx
Conjunto de quadro branco Vogel's RISE WBS75 75 polegadas para RISE 2xxx e RISE 4xxx
Conjunto de quadro branco Vogel's RISE WBS75 75 polegadas para RISE 2xxx e RISE 4xxx
Conjunto de quadro branco Vogel's RISE WBS75 75 polegadas para RISE 2xxx e RISE 4xxx
594,81 €
Whiteboard set for 75" screensThe RISE WBS75 whiteboard set is a universal system, suitable for all types of 75" (interactive) displays. This accessory allows you to mount a whiteboard to the left and right of your 75"" screen. The enamelled steel boards are attached top and bottom on a Vogel hinge,... Ler mais
Stock EsgotadoSem stock Código 1724868 Marca VOGELS Modelo 7300750 Garantia 3 anos

Envios e devoluções

Whiteboard set for 75" screens
The RISE WBS75 whiteboard set is a universal system, suitable for all types of 75" (interactive) displays. This accessory allows you to mount a whiteboard to the left and right of your 75"" screen. The enamelled steel boards are attached top and bottom on a Vogel hinge, which retains friction and writing stability even after frequent use. Nonetheless, should the friction become less than desired over time, the hinge can easily be adjusted.

Turn your display lift into a total solution.
Vogel's whiteboards are available for the three most common sizes of (interactive) screens 65", 75" and 86". Due to the height and depth adjustment of the whiteboard system, the whiteboards can be seamlessly attuned to any type of (interactive) screen.

Optimal learning resource for teachers.
The system's user experience during teaching is central to these products. The sturdy suspension system has a hinge that has been developed in-house which optimises the writing experience. The friction in the hinge allows the teacher to write in open, closed or half-open board formats. The magnetic closure ensures an unparalleled system to screen fit.

Easy to install.
Installation speed and convenience were key concepts during the development phase. The scale on the hinge's vertical and horizontal profile makes assembling the whiteboard set a piece of cake. The values which are subsequently read can be used to install the other side, and multiple other systems in the same way. Enabling the system to be built within 15 minutes.

Various RISE accessories.
All RISE motorized display lifts can be expanded with accessories such as laptop trays, video conferencing camera trays, sound bar mounts or hidden storage units. We offer a 5 year warranty on all RISE accessories. We offer a 25 year warranty on the enamelled steel boards.

Vogel's RISE WBS75 Whiteboard set 75" for RISE 2xxx & RISE 4xxx. Product colour: White, Minimum screen size: 190.5 cm (75"), Maximum screen size: 190.5 cm (75"). Width: 3644 mm, Height: 1020 mm. Compliance certificates: TÜV mark

Destaques principais
  • Installed in 15 minutes by one person
  • Height & depth adjustable to fit every screen
  • Adjustable friction hinge
  • Magnetic closure
  • For mounting on the RISE floor-wall solutions
Especificações
Ajuste de altura
Yes
Altura
1020 mm
Certificados de conformidade
TÜV mark
Cor do produto
White
Largura
3644 mm
Número de ecrãs suportados
1
Produtos compatíveis
RISE 2xxx, RISE 4xxx
Tamanho máximo do ecrã
190.5 cm (75")
Tamanho mínimo do ecrã
190.5 cm (75")
O histórico de preços ainda não está disponível
Ainda estamos a recolher dados de preços diários suficientes para este produto.

Escrever uma avaliação

Classificação *
O seu nome será apresentado publicamente – pode utilizar um pseudónimo. Convidamos os compradores a escrever avaliações; verificamo-las antes da publicação e publicamos também as avaliações críticas.
Vendedor: UAB KUR LT · Laisvės pr. 125A, LT-06118 Vílnius, Lituânia · Código da empresa 303192950 · NIF/IVA UE LT100008198612 · Envio a partir da UE (Lituânia)
Olá, sou o assistente de IA da DistriNode. Posso ajudá-lo a encontrar produtos, comparar opções, criar orçamentos em PDF ou abrir pedidos de suporte.
Todas as categorias