Marca: WHIRLPOOL
Stock: 10
Whirlpool FFWDB864349BVEE Washer Dryer 8 kg / 6 kg 1400 RPM — Genuine WHIRLPOOL product supplied by DistriNode.Available with live stock, verified pro..
Capacidade n...
8 kg
Rotação máxima
1400 RPM
486,16 €
Sem IVA:395,25 €
Marca: WHIRLPOOL
Stock: 4
TEMPERATURE ALARMDesigned for your peace of mind.The Temperature alarm feature warns you if there is an increase in temperature inside your fridge, he..
Ecrã integrado
Sim
Classe de ef...
E
Nível de ruído
Silencioso: menos de 35 dB
Capacidade d...
68 l
675,39 €
Sem IVA:549,10 €
Marca: WHIRLPOOL
Stock: 5
Whirlpool WHC20 T573 P, 280 L, No Frost (fridge), 32 dB, 7 kg/24h, D, White
Whirlpool WHC20 T573 P. Total net capacity: 280 L. Door hinge: Right. Noi..
Cor
Branco
Ecrã integrado
Sim
Classe de ef...
D
Nível de ruído
Silencioso: menos de 35 dB
797,57 €
Sem IVA:648,43 €
Marca: WHIRLPOOL
Stock: 14
Whirlpool MaxiSpace W8I HT58 T, Fully built-in, Full size (60 cm), Black, Touch, 1.3 m, 1.55 m
Whirlpool MaxiSpace W8I HT58 T. Appliance placement: F..
Classe de ef...
B
Classe de em...
A
Tipo de máqu...
Máquina de lavar loiça encastrável
Serviços
13-14 conjuntos
584,55 €
Sem IVA:475,24 €
Marca: WHIRLPOOL
Stock: 24
Whirlpool W55Z1 112W, 95 L, 6.5 kg/24h, SN-T, 35 dB, E, White
Whirlpool W55Z1 112W. Freezer net capacity: 95 L, Climate class: SN-T, Freezing capacit..
Classe de ef...
E
Tipo de cong...
Arca congeladora
No Frost
Não
Capacidade d...
95 l
249,24 €
Sem IVA:202,63 €
Marca: WHIRLPOOL
Stock: 6
Whirlpool WHMFF 6312 W4E, 286 L, 34 dB, E, White
Whirlpool WHMFF 6312 W4E. Fridge net capacity: 286 L, Noise level: 34 dB. Fridge number of shelves/b..
Capacidade d...
250-349 l
Cor
Branco
Classe de em...
B
Classe de ef...
E
556,19 €
Sem IVA:452,18 €
Marca: WHIRLPOOL
Stock: 10
WHIRLPOOL Refrigerator WHK 26362 XBR4E, Height 186,5 cm, Energy class E, No frost — Genuine WHIRLPOOL product supplied by DistriNode.Key specification..
Capacidade d...
Menos de 150 l
Cor
Preto
Tipo de frig...
Mini frigorífico
Característi...
No Frost
508,72 €
Sem IVA:413,59 €
Marca: WHIRLPOOL
Stock: 5
Whirlpool W5V5LCW, Freestanding cooker, Black, White, Buttons, Rotary, Touch, White, Bottom, Storage drawer
Whirlpool W5V5LCW. Product type: Freestan..
Tipo de cont...
Botões, rotativo e toque
Ecrã integrado
Sim
Capacidade d...
60 l
Classe de ef...
A
411,27 €
Sem IVA:334,37 €
Marca: WHIRLPOOL
Stock: 48
Whirlpool AKR 62F LT K, 650 m³/h, Ducted/Recirculating, A, A, D, 65 dB
Whirlpool AKR 62F LT K. Maximum extraction power: 650 m³/h, Type of extraction..
Classe de ef...
A
Número de ve...
4 velocidades
Nível de ruído
65 dB
Tipo de exau...
Montagem na parede
228,29 €
Sem IVA:185,60 €
Marca: WHIRLPOOL
Stock: 23
Air Conditioner Indoor Unit SPICR312WFI — Genuine WHIRLPOOL product supplied by DistriNode.Available with live stock, verified product data, official ..
Tipo de ar c...
Unidade interior
174,28 €
Sem IVA:141,69 €
Marca: WHIRLPOOL
Stock: 8
Air Conditioner Indoor Unit 5KW SPICR318WFO — Genuine WHIRLPOOL product supplied by DistriNode.Available with live stock, verified product data, offic..
Tipo de ar c...
Unidade exterior
423,06 €
Sem IVA:343,95 €
Marca: WHIRLPOOL
Stock: 17
The Whirlpool WHC18D071A1 is a high-performance built-in fridge-freezer designed to seamlessly integrate into your kitchen while delivering exceptiona..
Cor
Branco
Classe de ef...
D
Nível de ruído
Silencioso: menos de 35 dB
Posição do c...
Congelador inferior
563,25 €
Sem IVA:457,93 €
Marca: WHIRLPOOL
Stock: 4
The Whirlpool W7IHT40T is a fully integrated dishwasher designed to blend seamlessly into your kitchen cabinetry while delivering exceptional cleaning..
Classe de ef...
C
Classe de em...
B
Tipo de máqu...
Máquina de lavar loiça encastrável
Serviços
13-14 conjuntos
612,85 €
Sem IVA:498,25 €
Marca: WHIRLPOOL
Stock: 1
Introducing the Whirlpool WHVA 62F LM K wall mounted chimney hood, designed to efficiently remove cooking odors, steam, and grease from your kitchen. ..
Classe de ef...
A
Nível de ruído
65 dB
Tipo de exau...
Montagem na parede
Tipo de extr...
Extração e recirculação
279,26 €
Sem IVA:227,04 €
Marca: WHIRLPOOL
Stock: 7
The Whirlpool WPS D8 WBS EE is a front loading heat pump dryer with an 8 kg drying capacity and a white finish. It features a digital display, delayed..
Capacidade n...
8 kg
Sistema de s...
Bomba de calor
556,22 €
Sem IVA:452,21 €
Marca: WHIRLPOOL
Stock: 3
The Whirlpool WF S7560 NE is a high-performance front-load washing machine designed to deliver exceptional cleaning results while caring for your fabr..
Capacidade d...
7 kg
Classe de ef...
A
Tipo de máqu...
Máquina de lavar de carga frontal
Velocidade d...
1500+ RPM
363,55 €
Sem IVA:295,57 €
Marca: WHIRLPOOL
Stock: 1
Are you tired of hand-washing dishes after every meal, wasting time and water? The Whirlpool W8I HF58 TU UK fully integrated dishwasher takes over the..
Classe de ef...
C
Tipo de máqu...
Máquina de lavar loiça encastrável
Serviços
13-14 conjuntos
Característi...
AquaStop / Proteção contra fugas
738,86 €
Sem IVA:600,70 €
Marca: WHIRLPOOL
Stock: 5
Experience exceptional fabric care with the Whirlpool WAM762WBBPL, a freestanding front-load washing machine that combines a 7 kg capacity with a powe..
Capacidade d...
7 kg
Classe de ef...
C
Local de ins...
Livre instalação
Tipo de máqu...
Máquina de lavar de carga frontal
403,46 €
Sem IVA:328,01 €
Marca: WHIRLPOOL
Stock: 13
The Whirlpool WSD74WBBPL is a front-loading heat pump dryer that combines a 7 kg capacity with A++ energy efficiency, making it a reliable choice for ..
Tipo de ecrã
LCD
Classe de ef...
A++
Classe de em...
B
Capacidade n...
7 kg
718,42 €
Sem IVA:584,08 €
Marca: WHIRLPOOL
Stock: 8
The Whirlpool WOI4S8PM1SB redefines convenience in built-in ovens with its 6th SENSE technology, which automatically adjusts cooking parameters for fl..
Tipo de cont...
Toque
Capacidade d...
73 l
Classe de ef...
A+
444,94 €
Sem IVA:361,74 €
Marca: WHIRLPOOL
Stock: 82
Limited kitchen space and the need for versatile cooking often clash, but the Whirlpool WMF200GNB built-in microwave oven resolves this by combining m..
Ecrã integrado
Sim
Capacidade i...
20 l
Tipo de inst...
Integrado
Potência do ...
700 W
218,00 €
Sem IVA:177,24 €
Marca: WHIRLPOOL
Stock: 3
Uneven baking, slow preheating, and stubborn grease can turn cooking into a chore. The Whirlpool WOI4S8HM2SWA built-in electric oven tackles these fru..
Capacidade d...
73 l
Classe de ef...
A+
429,56 €
Sem IVA:349,24 €